Odoo Engineering Change order for Bill of material bom

ECO BOM

Probuse Admin

Bill of Material (BOM)

Odoo CMS- Sample image floating  

Odoo Engineering Change Order (ECO)

An engineering change order (ECO) is a documentation packet that outlines the proposed change of Bill of material for product / items.

Main Features:

  • This app allow you to create Engineering Change Order (ECO) of Bill of Material.
  • Bill of Material will be maintain using version information
  • Workflow of full approval process and activation of new version of BOM.
  • PDF report of Engineering Change Order (ECO) of Bill of Material.
  • On activation OLD BOM will be inactive and new version BOM will be activated.
  • For more details please watch below screenshots and video

Menus Available:

  • Manufacturing
    • Engineering Change Orders
      • Bom Change Orders

Workflow of ECO